Why does it take so long for anything to get done here when it comes to road construction?
Oneal Lane took four years instead of the projected 1.5 years. Hwy 73 where I live is nowhere near the summer 2014 completion.
I just returned from a trip to Austin and I was floored when I saw the progress at an intersection I use to get to my brother's house. Picture an intersection like Airline and Barringer Forman where Kleinpeter is.
Now, from August 31, 2013 to present day they have built an overpass with 4 lanes, put 6 lanes under the overpass, built a single lane right turn lane that includes a 100 foot long bridge and all signal lights are up. They also have poured about 1/4 mile of the 4 lanes going to connect to the toll road. Supposed to be ready to use by July.
So I ask. What the hell is wrong with our construction companies around here?
Oneal Lane took four years instead of the projected 1.5 years. Hwy 73 where I live is nowhere near the summer 2014 completion.
I just returned from a trip to Austin and I was floored when I saw the progress at an intersection I use to get to my brother's house. Picture an intersection like Airline and Barringer Forman where Kleinpeter is.
Now, from August 31, 2013 to present day they have built an overpass with 4 lanes, put 6 lanes under the overpass, built a single lane right turn lane that includes a 100 foot long bridge and all signal lights are up. They also have poured about 1/4 mile of the 4 lanes going to connect to the toll road. Supposed to be ready to use by July.
So I ask. What the hell is wrong with our construction companies around here?